Barton 1792 Distillery

Project Description

Location

Bardstown, KY

Owner

Barton Brands of KY

Bardstown, KY

Engineer

Heritage Engineering

Lousiville, KY

General Contractor

Dugan & Meyers

Lousiville, KY

Description

Construction of a facility designed for pre-treatment of the distillery’s average daily effluent flow of 315,000 gpd. The pre-treatment process is used to control the distillery’s effluent wastewater quality before entering the city’s sanitary sewer system. The project included converting the existing lagoon 3 into a sludge holding basin, construction of a new 30’ diameter clarifier, CMU power/control building, a RAS/WAS pump station, two (2) 40’ diameter stainless steel EQ tanks, as well as influent/effluent DIP at the existing lagoons.